Thursday, August 30, 2012

Friday, August 17, 2012





August 16, 2012 and things are moving right along! The plumbing has been roughed in, some interior walls are framed up. The windows are cut out and the old brick on the exterior is off and ready for the new brick soon! The overhead duct work is 80% installed. Keep up the good work, guys!

Thursday, August 2, 2012






August 2, 2012....Things are really looking different inside the building! The interior walls are all torn out, and sections of the ceiling removed. They are heating the old floor tiles (Whew, it was hot in there!) and pulling them up a section at a time. The large area cut in the concrete floor where you see dirt is where the new public restrooms will be located! Drive by sometime and you will see big changes outside too....75% of the brick front has been chipped off in preparation for windows and new brick.